Thursday, April 1, 2010

March 20: The floor is done!

Dad and Nate worked really hard on the floor all day and got it done late at night. It looks amazing. At first I was concerned that the color would be too light, but it has dark grain that works with the existing wood in the room. Also, it really brightens up the room. They did a great job going around the fireplace and finishing the floor in the numerous door frames and crawl space.


I went to the apartment and packed another car load. Then I brought it back to the house and unpacked. Then I dusted, cleaned, and polished all of the trim on the top level and part of the main level of the house. It was so dirty.

Mom spent the day doing a few touch-ups from where it was scraped during the carpet installation process. Then she finished the kitchen!!! She could be heard singing "ding dong, the fugly green is gone...". What a transformation. The cupboards are so much happier now with a complimenting color palate. We painted two colors to make the long eat-in kitchen seem more like two rooms: a dining room, and a kitchen. The kitchen still needs more attention. The previous owners aparently used the counter tops as cutting boards so they need to be replaced sometime soon. I would also like a new sink as this one is not very efficient. The drains are on the side of the basin, not centered, and the bottom is flat so nothing goes down the drain without quite a bit of coaxing.

We got so much accomplished today.

No comments:

Post a Comment